| # | Project Description | Year | Client |
|---|---|---|---|
| 1 | GA drawings for heavy fabrication shop | 2018 | L&T (India) |
| 2 | 3D modeling for auto component assembly Tata Motors Ltd. | 2018 | HAC ENTERPRISES |
| 3 | Reverse engineering of gear housings | 2019 | Gasket India (pune) |
| 4 | 3d Product animation for industrial pump | 2019 | Kirloskar Group (India) |
| 5 | Plant animation for factory layout | 2020 | RD Rubber Reclaimer Ltd. JSR |
| 6 | Electrical design for production uni of SAIL Bokarot | 2020 | Narmata Engineering |
| 7 | MEP drawings for manufacturing facility | 2021 | Electro Steel Limited (Bokaro) |
| 8 | Architectural drawings for factory | 2021 | RKFL Jamshedpur |
| 9 | 3D CAD modeling for CNC machine base | 2021 | Orient Engineering Works |
| 10 | Reverse engineering of casting molds | 2022 | Hindustan Zinc (India) |
| 11 | Conveyor GA drawings for assembly line | 2022 | Blue Star Malleable Pvt.Ltd. |
| 12 | 3D animation for assembly operation | 2022 | Sarda Enterprises |
| 13 | 3D Model Development for assembly operation | 2022 | Ashoka Steels Adityapur |
| 14 | Electrical panel layout drawings | 2023 | JSW Raigarh |
| 15 | GA & layout for packaging machinery | 2023 | Voltas Ltd. |
| 16 | Reverse engineering of Coal Hoopers,Sail Vizag | 2023 | Benerjee Engineering and co |
| 17 | Digital geo Maping Drawing | 2024 | Adhunik Power Ltd. |
| 18 | 100000 Sq.Feet Shed Design with 50 ton Crane setup Design | 2024 | MSP Steel Ltd. Raigarh C.G |
| 19 | Product animation for Grinding Media Balls | 2024 | Blue Star Malleable Private Limited |
| 20 | 200m Roller Conveyor Design | 2024 | Adhunik Power Limited |
| 21 | MEP Design,Preparation of BOQ and Tendering Consultancy for Tata Steel Limited | 2024 | Dixon Technologies (Kolkata) |
| 22 | 2D Layout for Power Backup System(Generater Unit) for JPIT Ranchi | 2025 | Sanjay Desiel Delhi |
| 23 | Reverse engineering of extrusion die | 2025 | Hindalco (India) |
| 24 | GA drawing for steel rolling mill | 2025 | JSPL (India) |
| 25 | Safety Training by architectural Animation | 2025 | ABB India |
| 26 | 8feet x 4feet 3d Architectural Model Making of factory | 2025 | MSP Steel Ltd. Raigarh C.G |
| No. | Project Description | Year | Client |
|---|---|---|---|
| 1 | Complete transfer chute design including DEM analysis and preparation of GA and detailed engineering drawings | 2023 | Visa Steel Limited |
| 2 | Conveyor design with complete detailed engineering | 2024 | Tata Power Limited |
| 3 | Feasibility study of coke screening system for msp steel limited | 2025 | MSP STEEL LTD. |
| 4 | LOD200 Structure,Conveyor,Mechanical Component etc. for MECON LTD | 2026 | MECON LTD. |
| 5 | 100 Meter Belt Conveyor Design ,Detailings and DEM for NTPC Sigrauli MP | 2026 | Trackon Associates Bhopal. |
| 6 | Alumina Powder Chute modification modeling,Fabrication Drawing and DEM simulation to minimize dedusting issue | 2026 | Ducon Infratechnologies Limited Mumbai |
| 7 | Alumina Powder dedusting pipe CFD simulation | 2026 | Ducon Infratechnologies Limited Mumbai |
| 8 | Evaporator Coil Heat Transfer CFD Analysis | 2026 | Daikin Airconditioning India Private Limited Neemrana |
| 9 | Fire Smoke Management CFD Analysis for High Rise Basement | 2026 | Godrej Properties Limited Mumbai |
| 10 | Cooling Tower Airflow Distribution CFD Simulation | 2025 | Voltas Limited Mumbai |
| 11 | Pump Impeller Fluid Flow CFD Simulation | 2024 | KSB Limited Pune |
| 12 | Warehouse Ventilation and fire smoke CFD Analysis | 2026 | Reliance Industries Limited Mumbai |
| 13 | Evaporator Thermal Performance CFD Simulation | 2025 | Thermax Limited Pune |
| 14 | CFD and FSI Thermal Structural Analysis of Shell and Tube Heat Exchanger | 2025 | Steel Authority of India Limited (SAIL) | 15 | FEA Structural Analysis of Tip Trailer Chassis, Frame and Pin Assembly | 2026 | Tata Motors Limited |
| 16 | Multiphysics Simulation of Plate Heat Exchanger for Heat Transfer Optimization | 2025 | Alfa Laval India Limited |
| No. | Project Description | Year | Client |
|---|---|---|---|
| 1 | 20000 Sq Feet Factory Shed Design,BoQ with Stability Report in Deoghar Jharkhand | 2025 | Jaiswal and Sons |
| 2 | 5000 SQ Feet Goatery Farming TRIPLE Layer Shed Design,BoQ,Analysis | 2025 | M.K Enterprises |
| 3 | Boiler Head Structure Design,BoQ,Analysis | 2025 | Vedanta Power Ltd.Jharsuguda |
| 4 | 100000 Ltr Water Tank Structure Design,Analysis,BoQ Electo Steel Ltd.Bokaro | 2025 | Electo Steel Ltd. |
| 5 | Dust Control System Design,Strcture Design and Analysis | 2026 | TSL Anagul odisha |
| 6 | Plant Extension Shed Design ( 50m x 24m) | 2026 | Patil Rail Infrastructure Ltd Anara W.B |
| 7 | Plant Shed Design ( 100mx28m) | 2026 | Patil Rail Infrastructure Ltd Bokaro |
| No. | Project Description | Year | Client |
|---|---|---|---|
| 1 | Ganesh Dham 15 Acre Ploting layout,3d Rendering | 2023 | Ganesh Develpers Singrauli M.P |
| 2 | Ploating 3D Walk through rendering | 2023 | Urmichand Homes |
| 3 | Hemant Ennclave G+8 Floor , 4 wing ,Front Elevation,Layout plan drawing,Structure Drawing | 2024 | Motwani Constructions Pvt Ltd |
| 4 | G+6 Front elevation, Interior Design, walk through Video | 2025 | Zivaah Greens Pvt Ltd Bhubaneswar |
| 5 | Office Design and Interior Design | 2025 | Spacewood Group Nagpur |
| 6 | Complete School Campus Design & Structural Engineering Project | 2025 | ODM Public School Ranchi |
| 7 | Office Architectural Layout and Interior Design | 2024 | Linde Group Jamshedpur |
| 8 | Industrial Platform Structure Design and 3D Modeling | 2025 | Linde Group Jamshedpur |
| 9 | Commercial Complex G+6 , Structure ,Layout (8000 sq feet) | 2025 | Hira Heritag Ranchi |
| 10 | Industrial Shed Design and Wind Load Analysis 20000 Sq.Meter | 2026 | UltraTech Cement Limited |
| 11 | Industrial Heavy Storage Tank 1000000ltrs Structure Design and FEA Analysis | 2026 | 2nd Party of Indian Oil Corporation Limited |
| 12 | Coal Storage Shed Design with Wind and Dead Load Analysis | 2026 | NR ENTERPRISES NAGPUR |
| 13 | STEM science Center Korba Chhatisgarh -40000 sqfeet Structure | 2026 | Adani Group |
| 14 | Over Head Tank ( 16m height) capacity 60000 liters Structure Deign and Analysis | 2026 | Patil Rail Infrastructure Limited Bokaro |
| No. | Project Description | Year | Client |
|---|---|---|---|
| 1 | UCIL Auditorium MEP and Fire Fighting System design & implementation | 2024 | 2nd Party Roll |
| 2 | G+6 MEP & Fire Fighting system Design and Implementation | 2025 | RS Tower Ashok Nagar |
| 3 | Fire detection & sprinkler systems Design and Execution | 2025 | Kshitij Hospital & Research centre ,Hazaribagh, Jharkhand |
| 4 | Hospital Extension MEP & Fire Protection Design and Execution | 2025 | Asarfi Hospital Dhanbad Jharkhand |
| 5 | Complete MEP Design Including HVAC, Electrical, Plumbing, Fire Fighting & Smoke Management for Science Center | 2026 | Science Center, Korba, Chhattisgarh |
| 6 | Complete MEP Design for Multi-Specialty Hospital | 2026 | NH Nursingh Home Bhubaneswar |